Installation manual

98
Maintenance
8. Maintenance
In order to ensure the normal operation of the PV Inverter, please check it regularly at least once
every 6 months. Check that all the terminals, screws, cables are securely in place. If there are any
damaged parts, please contact a qualied technician to repair it or to replace it with a new spare
part. To ensure that no foreign contaminants enter the warm air outlets, please have them cleaned
every 6 months by qualied technicians.
WARNING
Death and serious injury may occur!
Before engaging in maintenance of the inverter, please disconnect AC
and DC power to avoid risk of electric shock.!
8.1 Cleaning the Fans
Loosen the 4 screws in the four corners of the fan bracket rst (circled below). Pulling the bracket
slightly away from the inverter, the user will notice 4 sets of fan connectors. Disconnect the fan
connectors one by one and then pull the fan bracket from the inverter for cleaning. Call the sup-
port hotline for assistance in procuring a new replacement fan.