Specifications
| 6 | ProFlow Eliminator
Placing Conditioner into
Operation
A er all previous steps have been completed, the unit
is ready to be placed into operation. Follow these steps
carefully.
1. Remove control valve cover by fi rst releasing the
plastic clip from the back of the cover. Pull back of
cover slightly outward and li up.
Note: The following steps will require turning the
indicator knob ( and ) to various positions. Manually
rotate the camsha COUNTERCLOCKWISE only
until indicator knob points to desired position. (See
manual regeneration sections for each control’s
manual operation.)
2. Rotate indicator knob COUNTERCLOCKWISE until
it points directly to the word BACKWASH.
3. Fill media tank with water.
a. With water supply off , place the bypass valve(s)
into the “not in bypass” position.
b. Open water supply valve very slowly to
approximately the 1/4 open position.
IMPORTANT: If opened too rapidly or too far, media
may be lost. In the 1/4 open position, you should hear air
escaping slowly from the drain line.
c. When all of the air has been purged from the tank
(water begins to fl ow steadily from the drain),
open the main supply valve all the way.
d. Allow water to run to drain until clear.
e. Turn off water supply and let the unit stand for
about fi ve minutes. This will allow all trapped air
to escape from the tank.
4, Add water to brine tank (initial fi ll).
With a bucket or hose, add approximately
4 gallons (15 liters) of water to brine tank. If the tank
has a salt platform above the bo om of the tank, add
water until the level is approximately 1 inch (25 mm)
above the platform.
5 Place the conditioner into operation.
a. With the water supply valve completely
open, carefully advance the indicator knob
COUNTERCLOCKWISE to the center of the
BRINE REFILL position. Hold at this position
until water starts to fl ow through the brine line
into the brine tank. Do not run for more than one
or two minutes.
b. Advance the indicator knob
COUNTERCLOCKWISE until it points to the
center of the BRINE/SLOW RINSE position.
c. With the conditioner in this position, check to
see if water is being drawn from the brine tank.
The water level in the brine tank will recede
very slowly. Observe water level for at least three
minutes. If the water level does not recede, or if it
goes up, reference the Troubleshooting section.
d. Advance the indicator knob
COUNTERCLOCKWISE to the SERVICE
position and run water from a nearby faucet until
the water is clear and so .
Electrical Connection
100 VAC, 115 VAC, and 230 VAC units: Remove twist tie
from the power cord and extend cord to its full length.
Make sure power source matches the rating printed on
the control. Be certain a wall switch does not control the
outlet.
12 VAC: Connect the plug of the transformer (supplied)
secondary cable to the mating socket at the rear or bo om
of the timer housing. Be certain the transformer is secure
and is plugged into a power source of correct voltage that
is not controlled by a wall switch.
Ion Exchange
Cation resin is used to create the ion-exchange process
wherein dissolved minerals are removed and replaced
with sodium ions.










