Specifications
Table Of Contents
- HP 8200 zl Switches
- Installation and Getting Started Guide
- Contents
- Introducing the HP 8200 zl Switches
- Installing the HP 8200 zl Switches
- Included Parts
- Power Cords
- Installation Procedures
- Summary
- Installation Precautions
- 1. Prepare the Installation Site
- 2. Mount the Switch Chassis
- 3. Install the Switch Modules
- 4. Install the Power Supplies
- 5. Verify the Switch Passes Self Test
- 6. Install the Grounding Wire
- 7. Connect the Switch to a Power Source
- 8. (Optional) Connect a Power Supply Shelf to the switch
- 9. Connect the Network Devices
- 10. (Optional) Connect a Console to the Switch
- Hot Swapping Switch Modules
- Example Network Topologies
- Getting Started With Switch Configuration
- Replacing Components
- Troubleshooting
- Specifications
- Switch Ports and Network Cables
- Cabling and Technology Information Specifications
- Mode Conditioning Patch Cord
- Twisted-Pair Cable/Connector Pin-Outs
- Safety and Regulatory Statements
- Recycle Statements
- Index
- Installation and Getting Started Guide

4-4
Replacing Components
Replacing Power Supplies
Replacing Components
3. Insert the power supply into the opening. Slide it all the way in until it
connects to the switch. The power supply face plate will be flush with the
back face of the switch.
tighten the four screws
Figure 4-2. Power Supply Installation
4. Tighten the four retaining screws that hold it in place. Be careful not to
overtighten the screws.
For more detail refer to the ProCurve Switch zl Internal Power Supply
Installation Guide (5991-3787).