Technical data
Procon
. G N
These instructions are intended to assist the installer, commissioning and maintenance technicians and the
user with the application and use of the Procon , , & gas red condensing boilers.
Please read this manual fully before commencing the installation of the appliance. The Procon boilers must
be installed by competent persons as de ned by local, national and European regulations.
This manual must be handed to the appliance user following completion of the installation. The appliance
must not be left to operate with the outer casing removed.
Conformity Statement
Procon , , & boilers are manufactured to the highest standards of quality, performance and safety,
in accordance with EC standards and carry the CE mark.
Installation Requirements
All gas appliances must be installed by a competent and quali ed person, in accordance with relevant clauses
of applicable standards and recommendations. These include but may not be limited to the following:
• I.S. Domestic Gas Installations
• I.S, Non-Domestic Gas Installations
• All relevant Building Regulations.
• Local Water Bye Laws
• IEE Wiring Regulations
• Health & Safety legislation
Failure to install this appliance correctly could lead to prosecution. It is in your own interest and that of safety
to ensure that the law is complied with.
Manufacturer’s instructions must NOT be taken in anyway as over-riding statutory obligations.










