Product specifications
12
INSTALLING GAS LINE
NOTI CE: A qualified service person must connect heater to gas supply. Follow all local codes.
IMPORTANT: See Connecting to Gas Supply in your log set owner’s manual for details on gas hookup.
You may run the gas line from either side of the firebox (see Figure 10). Decide which side you want to run the gas
line from.
Note: This is one option for installing shutoff valve. Check local codes for equipment shutoff valve location
requirements.
Using optional fiber panels
There is a gas knockout in each side panel for the gas line to feed through. Determine on which side the gas
connection will be located. Using a utility knife or cutting blade, remove the identified gas knockout.
CAUTION: Do not use excessive force to remove the knockout. Too much force may damage the fiber panel.
Figure 10
Figure 11
Equipment Shutoff
Valves (Install One)
Knock Out
Locations
(Knock Out
One Hole)
Gas Line Hole
KnockOut
Remove
This Area
1/2” Thick Liner
Firebrick Side Wall
Side View










