Use And Care Manual
www.usaprocom.com
5200016-01D
WARNING: Before installing
the blower, be certain to turn off
the unit, and allow time for unit
to cool down.
1. Remove upper rebox by unscrewing
left and right screws on the rebox (see
Figure 1).
Figure 1 - Remove Upper Firebox
Figure 2 - Remove Heat Insulation Board
Cover
Figure 3 - Attach Temperature Sensor to
Heat Insulation Board
Figure 4 - Attaching Wiring
2. Unscrew two screws on heat insulation
board cover (see Figure 2).
3. Afx temperature sensor to heat insulation
board cover with two M4.2X8 screws (AA).
4. Insert wires into the space between wire
protecting board and shell. Attach the
wires to the top cover with wire routing
clip.
Wire Routing Clip
Temperature
Sensor
Screw (AA)
Protecting
Board
INSTALLING TEMPERATURE SENSOR
5. Connect wires to temperature sensor as
shown in Figure 5.
6. Reinstall heat installation board cover with
2 screws (see Figure 2).
7. Replace upper rebox using 2 screws
removed in step 1.
Figure 5 - Connecting Wires to
Temperature Sensor
Temperature
Sensor
Wiring