Warranty

www.usaprocom.com
200063-01A12
MODEL WAN24LA
1. Slide the two rear log grate steps over the
two outer horizontal supports on the grate
as shown in Figure 15.
2. Place back log #1 onto the grate steps
(see Figure 16).
3. Place front logs #2 and #3 on the grate
and slide forward against the front bars
on the grate (see Figure 17).
4. Place logs #4 and #5 onto logs #1, #2 and #3
by inserting locating pin on log #1 into lower
hole of logs #4 and #5 (see Figure 18).
5. Place log #6 onto log #5 by inserting locat-
ing pin on log #5 into lower hole of log #6
(see Figure 19).
INSTALLATION
Figure 15 - Installing Grate Steps
Figure 16 - Installing Back Log #1
Figure 17 - Installing Front Logs #2 & #3
Figure 18 - Installing Top Logs #4 & #5
Figure 19 - Installing Top Logs #6 & #7
Figure 20 - Installing Top Log #8
Log #6
6. Place log #7 onto logs #4 and #6 by insert-
ing locating pin on log #4 into lower hole
of log #7 (see Figure 19).
7. Place log #8 onto logs #6 and #7 by insert-
ing locating pin on log #7 into lower hole
of log #8 (see Figure 20).