Warranty
www.usaprocom.com
11200063-01A
INSTALLATION
1. Slide the two rear log grate steps over the
two outer horizontal supports on the grate
as shown in Figure 10.
2. Place back log #1 onto the grate steps
(see Figure 11).
3. Place front logs #2 and #3 on the grate
and slide forward against the front bars
on the grate (see Figure 12).
4. Place logs #4 and #5 onto logs #1, #2 and #3
by inserting locating pin on log #1 into lower
hole of logs #4 and #5 (see Figure 13).
5. Place log #6 onto log #5 by inserting locat-
ing pin on log #5 into lower hole of log #6
(see Figure 14).
6. Place log #7 onto logs #4 and #6 by insert-
ing locating pin on log #4 into lower hole
of log #7 (see Figure 14).
MODEL WAN18LA
Figure 10 - Installing Grate Steps
Figure 11 - Installing Back Log #1
Figure 12 - Installing Front Logs #2 & #3
Figure 13 - Installing Top Logs #4 & #5
Figure 14 - Installing Top Logs #6 & #7
Log #6