Warranty
www.usaprocom.com
200063-01A10
INSTALLATION
TESTING BURNER FOR LEAKS
WARNING: Never check for
gas leaks with open ame.
1. Generously apply a noncorrosive leak
detection uid to all connections.
2. Light the burner with the shutoff valve, no
more than half open, and holding a match
slightly in front of the pan (see Lighting
Instructions, page 13).
3. Inspect all connections for bubbles,
raw gas odor, or ame from any area
other than the burner (leaks). If leaks are
detected, shut off the gas valve immedi-
ately. Tighten, or reassemble the loose
connection(s) using pipe joint compound
until burner system is leak free.
4. When the burner is tested and leak free,
observe the individual tongues of ame
on the burner.
Note: Let the burner manifold cool rst
before removing to unclog port blockages.
The burner design includes more ports
on the outside of the bar. Make sure that
all ports are clear and producing ame
evenly across the burner. If any ports
appear blocked, clear them by removing
the burner manifold and reaming the ports
with a modied paper clip or other suit
able tool.
5. When nished testing, turn the gas shutoff
valve OFF to extinguish all ames.
INSTALLING LOGS
WARNING: Failure to posi-
tion the parts in accordance
with these diagrams or failure
to use only parts specically
approved with this heater may
result in property damage or
personal injury.
It is very important to install the logs exactly
as instructed. Do not modify logs. Use only
logs supplied with heater.
Each log is marked with a number. This
number will help you to identify the logs when
installing.
After installing logs, add decorative cinders
around the grate base, do not place any
decorative cinders on logs or burner.
Note: Leave as much open space between top
logs as possible to minimize ame impinge-
ment and sooting.
Note: Logs may chip if they are handled
roughly or if hit together while being placed.
ADDING PAN MATERIAL
1. Open the bag of ash bed material (ver-
miculite) and spread it evenly across the
burner pan to the top. You may over-ow
the front and sides of the pan to cover the
entire pan and connecting hardware. Do
not cover control system valve.
2. Open the glowing embers and evenly
cover the ash bed material (vermiculite)
in the burner pan.
Figure 9 - Glowing Embers and
Vermiculite