Operating instructions
Process
llealing Company,
lnc
2732
3rd
Ave.Soullr
P.O. Box
84585
seaille,
wA
98124
Unitized
Heater
Kit
lnstal lalion
and Operation
Every
Process Healíng Company
(PHCo)
product
is
eflicient,
safe and
reliable.
ll
properly
inslalled
and
mainlained PHCo
producls
will
give
you
rnany
years
ol
dependable
service. Should your
healer
be damaged
when
received, lile a claim
with lhe carrier
immedialely.
WARNING!III!I!
DANGER!!!!I!I
1. Read
and undersland
all
lags
and
inslallation and
operaling
instructions before commencing.
2. Welding arêa
on tank should be thoroughly cleaned
3.
Work
area
should be
well
venlilated.
4.
Check
that the electrical service will
handle
llre
load
Unil
must
be adequately
grounded.
5. All wiring
should confornr
lo
requirenlents
ol national anrJ
local electrical
codes and or standards.
Only
a
licensed
electrician
should connecl
pow€r
to
partol
and
syslem.
6.
Never
expose
heater tubes
to air
wilh
power
on.
DANGER
OF EXPLOSION
MAY
EXIST.
7.
Ca¡s should be used
when working around
lubes wherl
cleaning or
installing. Walls are only
1/4" lhick.
B.
lf there
are
any
questions
concerning
lhe ralings
or
instruclions
please
conlacl
your
dislributor
or lhe
faclory. Phone
(206)
682-3414
Fax
(206)
682-1582
101'p1