Operating instructions

PREPARATION
FOR
USE
INSPECTION
Unpack the ladder,
ladder cáge
and handrail.
Check for damage that may
have occurred during
ship-
ment. Visually
inspect the
tank,
particularly
the
tank
jacket
and insulation
for damage
that may have
occurred
during
shipment.
Report any
damage to the
driver delivering the
tank.
SETTING
TANK IN PLACE
1. The
tank level
gauge
float has
been secured
to the roof
of the tank for shipment.
2. Install
ladder,
ladder
cage,
handrails
and
platform.
Securely tighten all fasteners
A
wnRNrNG
To avoid falls that
could result in
death or
serious injury,
do not climb
over the
guard
rails
on top of the tank for
any reason.
A
*lRNtNG
Keep
all
guards
in
place
when
operating
I
9