Operating instructions
6
7) INDIVIDUAL HEATERS NEED TO BE CONNECTED TO THE LOAD
FUSING IN THE CONTROL PANEL. WIRING SHOULD BE CONDUIT
ENCLOSED AND OF PROPER SIZE FOR RATED HEATER LOAD.
BE SURE TO “PACK AND POUR THE SEAL-OFFS” AS PER
ENCLOSED INSTRUCTIONS. RATINGS ARE SHOWN ON THE
WIRING BOX COVER OF EACH HEATER.
8) ALL WIRING SHOULD BE DONE BY A LICENSED ELECTRICIAN
AND MEET ALL NEC AND LOCAL CODES.