Specification
GSSIM Mini Scaffolding Assembly & Operating Instructions
4
STEP 3
Install “Platform C” on side braces B so that platform is fully seated within inner channel on top of side braces.
STEP 4
Rotate the platform clips into the engaged position. (See Figure D)
STEP 5
Install 4 casters (D) into legs of frames with 4 Connector Pins (F) (See Figure E)
STEP 6
Remaining 4 Connector Pins must be inserted fully in holes on frame.
(FIGURE G)
WARNING: Be certain all eight Pins are fully inserted and locked intos holes.
(See Figure H)
WARNING:
• RECHECK ALL SIDE BRACE LOCK PINS
AND ALL CONNECTOR PINS FOR FULL
ENGAGEMENT BEFORE ACCESSING
PLATFORM.
• RECHECK PLATFORM TO BE SURE IT IS
PROPERLY SEATED WITHIN SIDE BRACE
CHANNEL AND THE PLATFORM CLIPS ARE
FULLY ENGAGED.
• WHEN ACCESSING PLATFORM, CLIMB
OVER TOP OF FRAME LADDER.
• DO NOT SWING AROUND SIDE OF FRAME.
• REMOVE THE PLATFORM BEFORE
ADJUSTING THE DECK LEVEL.
TYPICAL APPLICATIONS INCLUDE:
• Painting
• Overhead Door Installation
• Acoustical/Ceilings
• Lighting and wire Maintenance & Electrical
• Drywall installation & taping
• General Building Maintenance
• Window Cleaning & Treatment Installation
• HVAC Installation
Figure D
8 Connector Pins (F)
Figure G
Figure E
Figure H








