Specifications

20/51
3.2 Preparation
Requirements for
receiving screen data
from GP-2500 series.
*1
GP-2500T:
PC in which GP-PRO/PBIII for Windows V5.0 or later is
installed. *2
GP-2500S/L, GP-2501T/S:
PC in which GP-PRO/PBIII for Windows C-Package02 V6.0 or
later is installed. *2
GP-2501L:
PC in which GP-PRO/PBIII for Windows C-Package02 V6.3 or
later is installed. *2
Transfer Cable
(The following three types of cables are available.)
GPW-CB02 (D-sub 9 pin to PC)
GPW-CB03 (USB to PC) *3
GP430-CU02-M or GPW-SET (D-sub 25 pin to PC)
*For GP-2500 series, it’s possible to send/receive a screen
via Ethernet (GP-2500T/S/L only) or with a CF card.
Requirements for
converting screen
data of GP-2500
series and
transferring the
converted data to
GP-4501TW
PC in which GP-Pro EX Ver.3.01 or later is installed.
Transfer Cable
(The following three types of cables are available.)
A USB transfer cable (model: CA3-USBCB-01)
A USB data-transfer cable (model: ZC9USCBMB1)
A commercial USB cable (USB Type A/mini B)
* Possible to send/receive a screen with a SD card, a USB
storage device, or via Ethernet.
*1: This step is required if screen data is saved only in the GP unit, not in any other device.
*2: Please use the same version or later as or than that of the software used during creating screens on
GP-2500 series. If you don’t know the version, we recommend you to use the newest version. The newest
version is GP-PRO/PBIII for Windows C-Package03 (SP2) V7.29. Those who have GP-PRO/PBIII for
Windows C-Package03 V7.0 can download it from our web site called [OtasukePro!]
(http://www.pro-face.com/otasuke/download/update/).
*3: GPW-CB03 is supported by GP-PRO/PBIII for Windows C-Package02 (SP2) V6.23 or later. You need to
install a driver from [Download] on our Web site called [OtasukePro!]
(http://www.pro-face.com/otasuke/download/driver/).
3.3 Receive screen data from GP-2500 series
This section explains, as an example, how to receive screen data from GP-2500 series
using a transfer cable, GPW-CB02 or GPW-CB03. If you have backed up screen data, this
step is unnecessary; skip to the next section [3.4 Convert screen data with the Project
Converter].