Installation and Operating Instructions

4
13. Check for damaged parts. Before using any PCS product, carefully check any part that appears damaged to
determine that it will operate properly and perform its intended function. Check for broken parts and any other condition
that may affect proper operation. Any part that is damaged should be properly repaired or replaced by a qualified
technician. Do not use the product if any part does not operate properly.
14. Replacement parts and accessories. When maintaining, only use accessories intended for use with this product.
Approved accessories are available from Pro Charging Systems (800.742.2740).
SAVE THESE INSTRUCTIONS!
INSTALLATION AND PREPARATION
To reduce risk of battery explosion, follow these instructions, those published by the battery
manufacturer, and by the manufacturer of any equipment that you intend to use in the vicinity of
battery. Review all cautionary markings on these products and on the engine.
Pour réduire le risque d’explosion, lire ces instructions et celles qui figurent sur la batterie.
GENERAL OPERATION
Use the Battery Fuel Gauge for a LEAD-ACID (lead acid, sealed lead acid, gel cell and AGM)
batteries only.
Utiliser le chargeur pour charger une batterie au plomb uniquement
Be extra cautious to reduce risk of dropping a metal tool onto battery. It might cause a spark or
short-circuit a battery or other electrical part, possibly resulting in an explosion. If damaged,
contact PCS (800.742.2740).
Never smoke or allow an open spark or flame in the vicinity of the battery or engine.
Ne jamais fumer près de la batterie ou du moteur et éviter toute étincelle ou flamme nue à proximité de ces dernie.
Working in the vicinity of a lead-acid battery is dangerous. Batteries generate explosive gases
during normal operation. For this reason it is of the utmost importance that prior to each use of your charger, you
read and follow the instructions provided exactly.
Il est dangereux de travailler a proximité d’une batterie au plomb. Les batteries produisent des gaz explosifs en service
normal. Il est aussi important de toujours relire les instructions avant d’utiliser le chargeur et de les suivre à la lettre.
INSTALLATION:
Below are the simple steps for installing the Battery Fuel Gauge
A Template is provided in order to determine the location of the mounting holes.
Step 1 - After determining the location for the Gauge, drill the necessary holes to allow for installation and feed the wiring to
the battery area.