Specifications
21
MAINTENANCE
All maintenance operations, whether ordinary or extraordinary, must be carried out
with the equipment switched off and the electricity and water supplies deactivated.
In particular, it is opportune that, at every change of filter, the reading of the litre
counter (if installed) and the date of the replacement are recorded.
RECORD OF MAINTENANCE CARRIED OUT
The following list is a guide to the scheduled operations which should be carried out
on the apparatus, according to the frequency suggested.
Part of the
apparatus
Type of
operation
Frequency of operation
Daily Weekly
Every 6
months
Annual
Front and
bodywork
Cleaning
sanitisation
Distribution
spout
NOTE
The times given in the table are indicative and refer to normal conditions of use.
Always, refer to the hygiene regulations of the location (local and/or national).
The frequency of the intervention is directly proportional to how much the machine
has to work, that is, the quality of the mains drinking water supply.










