Product Manual A

AIR Owners Manual 16
Nose
cone
Turbine assembly is now complete.
Step 4: Attach Turbine to Tower
IMPORTANT: Observe torque specs.
WARNING: The yaw pad is critical to ensuring secure turbine mounting to tower;
however, it sometimes makes it dicult to tell if the tower is fully inserted into
the yaw assembly. Check this carefully before raising the tower.
1.) Insert yaw pad into yaw pivot point/clamp assembly.
2.) NOT SHOWN: Complete turbine wiring connections.
1.) Insert tower into yaw assembly.
2.) Ensure yaw pad is in place.
3.) Tighten screws to secure turbine to tower.
1.) Ensure turbine is securely attached to tower.
Turbine
wires
Yaw pad
Yaw pivot
& clamp
Yaw pivot
& clamp
M5 Socket head screw
(comes imbedded in
yaw assembly)
Tower
tubing
5/32”
Hex
wrench