Product Manual A

AIR 40, AIR Breeze, AIR 30, AIR MaX, AIR X MARINE and AIR SILENT-X are trademarks of Primus Wind Power 2013 Primus Wind Power Inc. AIR Owners Manual 3-CMLT-2020 REV-A / 2-26-2021 15
Yaw pivot
& clamp
Tower
tubing
M5 Socket head screw
5/32” (comes imbedded in Hex
yaw assembly) wrench
STEP 4: Aach Turbine to Tower
4.) Insert tower into yaw assembly.
5.) Ensure yaw pad is in place.
6.) Apply Tef-Gel w/ applicator provided to yaw bolts prior to assembly.
Tighten screws to secure turbine to tower. It is important that Tef-Gel
is applied to all hardware prior to nal assembly.
7.) Ensure turbine is securely aached to tower.
8.) Ensure wire connecons are secure and double check for inial two
blinks by powering upturbine prior to raising the tower. This is especially
important when installed on boats or structures.
1.) Insert yaw pad into yaw pivot point/clamp assembly.
2.) NOT SHOWN: Complete turbine wiring connecons.
3.) Aer assembling the yaw clamp, insert yaw/wires into the tower, li
the yaw clamp assembly 1/8” to secure the yaw onto yaw pad to prevent
metal to metal contact and reduce vibraon down-tower. This is espe-
cially important when mounted on boat or structures.
IMPORTANT: Apply Tef-Gel to yaw bolts prior to assembly.
Observe torque specs during assembly. A small amount of Tef-Gel has
been applied to the top of yaw bolt threads for pre-assembly of the yaw at
the factory.
WARNING: The yaw pad is crical to ensuring proper and secure turbine
mounng to the tower; however, in some instances it makes it dicult to
tell if the tower is properly inserted into the yaw assembly. Check this care-
fully before raising the tower.
IMPORTANT: Further inspecon of the blade bolts, yaw bolts and rotor nut
are recommended and re-ghtened within 30 days aer inial installaon.