Primus Wind Power AIR 45' Tower Manual

PRIMUS WIND POWER DOCUMENT #0070 REV C
PRIMUS WIND POWER Page 5 of 26
2/4/05
Tower Setup Kit Parts List
Your tower setup kit includes: Quantity
Gin Pole Cap 1
100’ Rope 1
Snap Links – Work Load Rated to 400# 3
8-foot Cable 1
3/8” x 1 ½” Bolt 1
3/8” Lock-nut 1
Please inspect the contents to see that all parts are present and to familiarize yourself with the
pieces before beginning assembly.
Tools Needed:
Round or Half Round File Pliers
5/16” or 8mm Wrench, Socket or Nut Driver (preferred) Carpenters Level (optional)
(2) 9/16” or 15mm Wrenches or Sockets Torque Wrench (optional)
Sledge Hammer 5/16 Allen Wrench (incl./w turbine)