Specifications

18 Air X Owner’s Manual
Switch
Stop
Battery Bank
Earth
Ground
Generator
Green Lead
Tower Ground
Turbine Ground
Black Lead
Turbine Negative
Red Lead
Turbine Positive
AIR BREEZE
Wind Turbine
Tower
Ground
Rod
Fuse
or
Breaker
Red Lead
Turbine Negative
Black Lead
Green Lead
Turbine Positive
Generator
Stop
Switch
Turbine Ground
AIR BREEZE
Wind Turbine
Tower
Tower Ground
Fuse
or
Breaker
Turbine Positive
Meter
Generator
Tower Ground
Stop
Green Lead
Switch
Red Lead
Turbine Ground
Amp
Black Lead
Turbine Negative
AIR BREEZE
Wind Turbine
Tower
Battery
Disconnect
Fuse
or
Breaker
Fuse
or
Breaker
Fig. 12. Multiple Air X Wiring
5-2 Multiple Air X Wiring
Method One:
Each Air X is treated sepa-
rately. Each turbine will
have its own wires, stop
switch and fuse and will
connect directly to the
battery using the internal
regulator to control
charging.
Method Two:
Wire each turbine to a
“bus” and then run one set
of wires from the bus to
the battery. Each turbine’s
internal regulator or an
external diversion type
regulator may be utilized.
A “bus” system typically
results in reduced wire
costs.
It is possible to wire multiple
Air X turbines together. A
typical multi-turbine system
is depicted in Fig. 12.
There are two methods used
to accomplish this task.
Air X
Air X
Air X
TIP:
batteries wired in series and
Battery bank illustrated
is configured as four 6-volt
bank configuration and system
voltage are site specific.
=