Instructions

Concrete engineering
®
Telefon
+49 8638 / 88 55 92 00
Telefax
+49 8638 / 88 55 92 99
info@primo-gmbh.com
www.primo-gmbh.com
Primo GmbH
Gebrüder-Dickow-Str. 2
84478 Waldkraiburg
Stand 11/2017
Assembly instructions
Membrane box
Order-No.
Name VPE
P751 Membrane box 50
Remove the box cover on the back
side.
6
Perfect bending radios:
In accordance with DIN Norm for
network / fibreglass
8
Usable as electronic box:
Enough space for electronic
components.
7
Save time with the new membrane insertion
Safe strain relief through „Pipegrip“
Draftproof, absolutely concrete tight
70% more space to wire
Usable as electronic box
Absolutely safe connection through the SCS-technology
for standardized multi-combinations
Insert 2x M32 and 4x M20/M25 or 6x M20/M25 pipes
Installation
Integrated strain relief.
3
Nail the cover on the formwork with
the Primo-Nailer.
1
Cut the membrane insertion with an
knife.
2
Insert the pipes.
Stackable with a 71mm norm gap.
Fixed connection with the SCS-techno-
logy.
54