Specifications

PDS-PLUS/PDS-PLUS-W
Page 8 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
The PDS-PLUS/PDS-PLUS-W can be mounted to a ceiling with a minimum 6” thickness. Concrete wedge
anchors must be used for concrete installation. It is recommended that ¼” wedge anchors be used. A concrete bit
must be used to drill the pilot hole. The concrete wedge anchors and concrete drill bit are commercially available.
Ceiling Installation - Solid Surface
Begin by placing the upper bridge into position against the ceiling, keeping it level.
®
Mark off four holes to be used for securing the mount and place the upper bridge aside.
¯
Next, drill holes using the appropriate concrete bit for your anchor.
°
Insert a concrete anchor into each hole.
±
If necessary, a hammer can be used to lightly tap each anchor into place so that they are ush with the ceiling.
²
Remove the nuts and at washers from the concrete wedge anchors.
³
Once all of the anchors are in place, move the upper bridge back into position.
´
Attach the nut onto the threaded shaft that is protruding from the ceiling.
µ
Do not tighten until all nuts and at washers are in place.
Proceed to the “Attaching the PDS-PLUS/PDS-PLUS-W to the Projector” section.
Attaching the PDS-PLUS/PDS-PLUS-W to the Projector
To truly show the versatility of the
PDS-PLUS/PDS-PLUS-W, the following pictures
will show a variety of congurations that can be
achieved with the PDS-PLUS/PDS-PLUS-W. Your
individual application will depend on the purchased
projector.
Locate the mounting points on the bottom of the
projector (see arrows above for sample mounting
points).
Proceed to the “Attaching the Projector Plate”
section.