Specifications

PDS-PLUS/PDS-PLUS-W
Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 7
Step 1
Separate the Upper Bridge from the Base Box by
removing the six (6) M6 x 12mm Phillips head screws
(three on each side).
M6 x 8mm
Set Screw or
Security Set
Screw
Upper Bridge
Step 2
Use the appropriate slot openings for single
wood stud mounting, depending on your ceiling
conguration. The adjustable channel slots on the
upper bridge plate will allow you to ne tune the nal
orientation of the projector.
®
Secure the Upper Bridge to the center of the stud on
the ceiling structure at this time using two (2) #14 x 2”
wood screws (supplied).
Wood Stud
Ceiling Surface
Mounting Slot
Upper Bridge
#14 x 2˝ Wood
Screw
Step 3
Attach the base box to the upper bridge and secure
with the six (6) M6 x 12mm Phillips Head screws
(above).
DO NOT OVERTIGHTEN THESE SCREWS AT
THIS TIME.
M6 x 12mm
Screw