User Guide
- 15 -
16"
16"
Marking the mounting points on the wall
Place the bottom portion of the wall plate to the
reference line and mark the four (4) lag bolt mounting
points through the wall plate slots on the wall. Level the
wall plate with the reference arrow pointing up to the
ceiling.
See figure 11.
Wood studs: Drill four (4) ¼" pilot
holes to the marked wall.
Concrete wall: Drill four (4) 3/8” pilot
holes to the marked wall.
See figure 12.
Wood studs
Wall
p
late
Pilot holes
Drill gun
Wall
p
late
Level
Mounting slots
Woo
d
studs










