Specifications

SPI
Page 14 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
Removing the Projector
Use the M5 security Allen wrench to loosen the
M4 x 12mm Lock-It™ screw.
Place one hand under the projector to support it.
®
Lift the locking tab.
¯
While lifting the locking tab, rotate the SpiroLock™
collar assembly 15 degrees clockwise until you hear
an audible “click”.
You may nd it easier to lift the locking tab with
the thumb of the same hand which rotates the
SpiroLock™ collar assembly.
°
Use both hands to rotate the projector plate as shown
to separate it from the SpiroLock™ collar assembly.
±
Place the projector on a soft, at surface and
disassemble the mounting legs from the projector, if
neccessary.
Step 1
Step 2
The SpiroLock™ projector mount can be removed quickly if the projector needs service.
If the projector is heavy and/or bulky, two people may be required to safely remove the projector from the
SpiroLock™ Ceiling Plate.
If the projector is mounted higher than shoulder height, you may need to use one or more ladders to
safely remove the projector from the SpiroLock™ Ceiling Plate.