Installation Manual
- 6 -
(4) phillips
head screws
Threading cables through cable access holes (model: MMT)
Upper cable
access hole
To thread the cable or cables from the monitor through the
post, start at the top access hole and gently pull cable out of
the bottom access hole. See figure 3
Mounting Multi-Monitor Mount to wall or concrete (model: MMW)
To secure the wall mount to the wood stud first
mark three points with a pencil and then drill pilot
holes to start. Using (3) wood screws (supplied)
screw the back plate to the wall. Then secure the
front plate with the (4)M4 X 10 phillips screws
(supplied). See figure 4
Wood stu
d
Wall
Pencil mark
Front cover wall
plate
(
3
)
Wood screws
Wood stu
d
Conc
r
ete Slab
Back
Back
To secure the back wall plate into a concrete wall
use (4) wedge anchors (supplied). See figure 4a
Lower cable
access hole
Cable
Monito
r
Adjustable desk
clamp
Mark and drill
points at
Center-line of stud
Cable
(4) Wedge
anchors