Specifications
GB-AVSTOR4
Installation Instructions Visit the Premier Mounts website at www.mounts.com Page 7
Ceiling Attachment
Solid Surface
Wood Stud
Determine the mounting location.
®
Use a 1/8” drill bit to pre-drill the mounting holes.
¯
Secure the four (4) ¼” eye lag screws to the wood
stud in the ceiling.
°
Run the open end of the
1
/16˝ braided cable through
the hole in an eye lag screw.
±
Run the open end through the loop.
²
Pull the open end down until the
1
/16˝ braided cable
tightens around the eye lag screw.
³
Repeat steps 4-6 for the remaining three mounting
points.
The ceiling box must be secured using the Quick
Locks and
1
/16˝ braided cables (supplied).
Determine the mounting location.
®
Use a ¼” concrete drill bit to drill the mounting holes.
¯
Place the concrete eye anchor bolts into the pre-
drilled holes and gently tap into place using a rubber
mallet or hammer.
°
Run the open end
1
/16˝ braided cable through the hole
in an eye anchor bolt.
±
Run the open end through the loop.
²
Pull the open end down until the braided cable
tightens around the eye anchor bolt.
³
Repeat steps 4-6 for the remaining three mounting
points.
Wood Stud Ceiling
Concrete Ceiling
Eye Lag Screw
Eye Anchor Bolt










