MPM-G2 Assembly Instructions

A few words about the product
The Multi-Pole Mount - G2 (MPM-G2) is designed to mount on 3, 4, or 6 inch
SCH40/80 vertical steel pipe (installer supplied), and 4 x 4 inch square, or 5 x 4
inch rectangular horizontal tube. The goal of the MPM design is to limit the
number of ground penetrations which helps reduce ground work and the associated
labor costs.
Pipe size and foundation requirements are based on several factors including the
array surface area, maximum design wind speed, exposure category, soil type, tilt
angle and above-ground clearance.
For foundation and pipe size recommendations on a specific installation please
contact us at:
Phone: 800-260-3792
Email: info@plpsolar.com.
Assembly Instructions
These instructions include information on assembling the product and are intended
to be used by individuals with sufficient technical skills for the task. Knowledge
and use of hand tools, measuring devices and torque values is also required.
Included in these instructions are various Notes, Cautions, and Warnings that are
intended to draw your attention and assist in the assembly process and/or to draw
attention to the fact that certain assembly steps may be dangerous and could cause
serious physical injury and/or damage to components. Follow the procedures and
precautions in these instructions carefully.
Required Tools
1/2 inch wrench or socket for 5/16 inch module clamp hardware
3/4 inch wrench or socket for 1/2 inch hardware
Torque wrench
Ratchet wrench
Ratchet extension bar
3 to 6 foot level
Framing square
Tape Measure
The Multi-Pole Mount - G2
WARNING:
Follow the
procedures and
precautions in
these instructions
carefully.
STAINLESS STEEL HARDWARE CAN GALL WHEN TIGHTENED TOO
QUICKLY. INSTALLER SHOULD USE A SILVER GRADE ANTI-SEIZE
COMPOUND PRIOR TO ASSEMBLING ANY STAINLESS STEEL
HARDWARE. DO NOT USE AN IMPACT DRIVER. ALL OTHER DRIVER
TYPES SHOULD BE SET TO LOW SPEED SETTINGS.
WARNING
Assembly Instructions, Multi-Pole Mount - G2 (Version 1, Rev D) 1 of 15