User's Manual
MCPS2135 InstallationPlanning and PreparationIntroduction
MCPS2135 System Operation 15
2001 Spectrian Corporation. All rights reserved.
3 MCPS2135 Installation
3.1 Introduction
The following section describes how to install the MCPS2135 series amplifier in a
base station.
Each MCPS2135 system features rear-access RF input and output connectors, a
DC voltage input receptacle, and a front-access RS-232 status interface connector.
Additional optional features include a rear-access RS-422 serial interface
connector and a remote alarms interface connector. Specific connector pinout
information for your MCPS2135 configuration is provided in Appendix A3.
Please read and understand the instructions and warnings in this section and at the
beginning of this manual before handling or unpacking the MCPS2135 modules.
The MCPS2135 is designed to be installed by trained and qualified technicians.
+ Warning: Each MCPS2135 amplifier module and the shelf subassembly weigh
50 lbs (22.7 kgs); when crated for shipping an MCPS2135 system can weigh in
excess of 290 lbs (131.5 kgs) and be unbalanced. To avoid injuries or damage,
use care and obtain assistance when lifting a crate containing MCPS2135
components.
∗ Caution: Do not attempt to move an MCPS system with modules installed.
∗ Caution: Provide bottom support when removing an MCPA module to avoid
damage to the fan housing.
. Note: Local building and fire codes govern the manner in which some site
preparation and installation tasks are performed. Spectrian recommends that
you consult your local building inspector or a licensed engineer to ensure that
the site installation conforms to local building codes.
1.23.2 Task safety equipment, tools and materials
The following safety equipment, tools, and materials are recommended to perform
the installation tasks in this section.
Safety Equipment
• Safety glasses
• Work gloves
• Back-support belt
Tools
• Heat Gun (Master 10008 – MAS or equivalent)