User's Manual

Commissioning Nexus FT RMR
3-4 044-05207 Rev A
Initial Startup
To complete the inital start-up of the RMR, follow the steps listed in Table 3-3.
Table 3-2 Initial Statup Procedure
Step Action
1 Turn main power on
2 Check the LEDs on the RMR. Refer to Figure 2-1 in Chapter 2 for correct power up indications.
NOTE When optimizing RMRs, offset the UL gain 20dB less than the DL gain as a starting point.
Always monitor the UL pass bands for noise levels and/or IMDs when optimizing and
commissioning.