User's Manual
Nexus FT RMR Commissioning
044-05207 Rev A 3-3
Commissioning
Before proceeding, carefully read the Safety section and check all connections made during the installation.
A RMR can be configured locally with OM-Online by connecting a standard serial cable from the COM port on
the PC to the P31 PC port (RS-232) located on the front of the RMR Details on using OM-Online are
described in the OM-Online User ManualConnecting a PC for Local Access
Initial Startup
To complete the inital start-up of the RMR, follow the steps listed in Table 3-3.
Table 3-2 Initial Statup Procedure
Step Action
1 Turn main power on
2 Check the LEDs on the RMR. Refer to Figure 2-1 in Chapter 2 for correct power up indications.
NOTE When optimizing RMRs, offset the UL gain 20dB less than the DL gain as a starting point.
Always monitor the UL pass bands for noise levels and/or IMDs when optimizing and
commissioning.