User's Manual

Installation Instructions PAF-19XX-EX-XXX
3-4 044-05298 Rev A
Figure 3-2 Power Connections
Figure 3-3 Return Bus connection
Table 3-3 DC Power Installation Procedure
Step Action
1. Remove circuit breaker panel top protective cover
2. Connect fourteen individual red power cables, one to each input on the upper row of
connections. (designated Row A Figure 3-2)
3. Attach opposite ends of red MCM 250 powr cables to power plant’s main DC bus bar
after main shunt.
4. Insert fourteen individual black power cables into front of yellow and green ground
connections as shown in Figure 3-3 and tighten screws
5. Attach opposite ends of black power cables to power plant's main DC return bus bar
6. Connect PAF frame to halo grounding system at frame top (four locations) using green 6
AWG cable as shown in Figure 3-4
7. Reinstall circuit breaker panel top protective cover.
8. Affix supplied ground sticker directly beneath one utilized frame grounding points shown
in Figure 3-4
Row A
Row B
Ground Return Connections