User's Manual
G3L-1929-160-001 MCPA Initial Start-up and Operating Procedures
044-05305 Rev A 3-3
Initial Start-up and Operating Procedures
Perform the MCPA initial start-up per the instructions in Table 3-3.
CAUTION: Before applying power, ensure input and output cables are properly terminated at
the Duplexer front panel. Do not operate MCPA without a load attached. Excessive input
power may damage the MCPA. Refer to Chapter 5 for input power requirements.
Table 3-3 Initial Start-up Procedure
Step Action
1 Verify all system input and output cables are properly connected.
2 Verify +27 VDC (+/- 1 VDC) supply is available.
3 Set MCPA OFF/ON/RESET switch to ON (center) position.
4 Allow MCPA to warm-up for a minimum of two minutes before taking power readings.