User's Manual
Table Of Contents
- Revision Record
- Table of Contents
- List of Figures
- List of Tables
- Abbreviations
- Chapter 1 Product Description
- Introduction
- Scope of Manual
- Safety
- Warning Signs
- Human Exposure of RF Radiation
- Radiation Safety Distances
- Electrostatic Discharge (ESD)
- Overview
- Repeaters with RF / RF Transmission
- Repeaters with RF / Fiber Optic Transmission
- Repeater with Fiber Optics / RF Transmission
- Combined Repeater
- Repeater Chassis Design
- Channel Amplifier PCBA for GSM and EDGE (CHE)
- CDMA/WCDMA Segment Amplifier PCBA (CSA)
- Band Selective Amplifier PCBA (BSA)
- Power Amplifier PCBA (PA)
- Booster Amplifier (BA)
- Distribution PCBA (DIA)
- Control Unit PCBA (CU)
- Directional Coupler (DC)
- Low Noise Amplifier (LNA)
- Duplex filter (DPX)
- Fiber Optic Unit (FOU)
- Fiber Optic Node (FON)
- Power Supply Unit (PSU)
- Remote Control Unit (RCU)
- Combiner unit (CMB)
- Alarm Interface PCBA (ALI) and Remote Control Interface PCBA (RCI)
- Repeater-to-Repeater Interface Adapter (RIA)
- CSel GSM Repeater
- CSel CDMA/WCDMA Repeater
- CSel High Power CDMA/WCDMA Repeater
- BSel Repeater
- BMU
- RMU
- FOR
- Combined Repeater
- Shaded Area
- Fiber Optic Distribution Networks
- Multi-Operator Configurations
- Chapter 2 Controls, Connections and Indicators
- Chapter 3 Installation
- Introduction
- Site Survey
- Unpacking and Inspection
- Repeater Location
- Mounting
- Connections
- Main Power and Grounding
- RF-to-RF Repeater Connections
- Table 3-1 RF-to-RF Connections Procedure
- Table 3-2 BMU RF-to-Fiber Connections Procedure
- Table 3-3 RMU RF-to-Fiber Connections Procedure
- Table 3-4 FOR RF-to-Fiber Connections Procedure
- Table 3-5 Main Power Breakdown Relay Connection
- Table 3-6 PSU Replacement Procedure
- Table 3-7 Initial Statup Procedure
- Chapter 4 Maintenance
- Introduction
- Periodic Maintenance
- Table 4-1 Recommended Periodic Maintenance
- Table 4-2 Alarm Troubleshooting
- Table 4-3 FON Replacement Procedure
- Table 4-4 PSU Replacement Procedure
- Table 4-5 Repeater Replacement Procedure
- Return For Service Procedures
- Obtaining an RMA
- Repackaging for Shipment
- Remote Control Unit (RCU)
- RCU for Radio Communication
- RCU for Telephone Line Communication
- Previous RCU Version for GSM 900/1800/1900
- Repeater-to-Repeater Link (R2R)
- Traffic Statistics
- Battery Backup (BBU)
- 7/16" Antenna Cable Connectors
- Operation and Maintenance System (OMS)
- Chapter 5 Specifications
- Appendix A Block Diagrams
044-05250 Rev A 4-1
Chapter 4
Maintenance
Introduction
This chapter contains periodic maintenance and performance test procedures for the AR
Standard Repeater.
Periodic Maintenance
Periodic maintenance requirements are listed in Table 4-1, as well as the intervals at which
the tasks should be performed.
Table 4-1 Recommended Periodic Maintenance
Troubleshooting
The sections that follow contain a list of problems that could occur and a few suggested
actions that can correct the problem. If the suggested corrective action does not eliminate the
problem, please contact your Powerwave field representative or help line for further
instruction.
Clearing Alarm Faults
Table 4-2 contains a list of those alarms which can be generated in the repeater. Critical,
Error and Warning alarms can be sent automatically from a repeater to OM-Online and/or
OMS, stored and then viewed. These can be viewed in the Alarm window.
Table 4-2 Alarm Troubleshooting
Task Interval Action
Inspection of
cables and con-
nectors
12 months Inspect power, RF and Fiber cables for signs of damage or
wear (frayed insulation, cracks, punctures, etc.) Check con-
nections to be sure they are tight.
Optional Perform cable sweeps.
Clean equipment Clean as required depending on operating environment.
ID Alarm
Text
Alarm
Unit
Alarm Description
1 Power PSU Critical PSU1 in the cabinet does not work properly. A sum
signal from the PSU1 indicates that at least one volt-
age output has dropped. If no mains breakdown relay
is used, then the alarm will also be sent at mains
breakdown.
Ceasing PSU1 in the cabinet works properly again. Ceasing is
sent if the PSU1 works at start-up, and there is a cor-
responding critical PSU1 alarm logged in the Events
log. The repeater will restart when the power is back
and this alarm will be sent.