User's Manual

Table Of Contents
AR Standard Repeater Options
044-05250 Rev A 4-13
Fast flashing:Connection in progress
3.Green LED on the battery charger which is lit steady when the power supply is OK either
from the main input power or from the battery.
4.Yellow LED on the battery charger which is lit steady during battery charge from the main
input power.
A jumper is required between pins 2 and 3 on the P27 connector if the RCU is disconnected
from the DIA.
GSM subscriber conditions
Data rate = 9600 bps, transparent mode. If the PIN code has to be disabled, use another
phone. If you encounter problems with the PIN code, contact Powerwave Technical Support.
Power supply backup
If a power failure occurs the backup battery has capacity to supply the CU, ALI and phone/
modem for 30 minutes at room temperature and a limited number of call attempts. The
battery life is 1 - 2 years at normal indoor temperature. If the operational temperature is
higher, the battery life is shortened.
Repeater-to-Repeater Link (R2R)
This section briefly describes the R2R network. Node configuration for the R2R network is
described in the OM-Online User’s Manual.
Figure 4-3 R2R network
The R2R network is a Powerwave specific repeater network that can handle up to 13 nodes,
one or several of which being gateway repeaters for communication with OM-Online or OMS
via modem. Powerwave repeaters produced after January 2005 have the R2R functionality.
Repeaters produced prior to this date can be upgraded with an R2R network kit provided the
repeaters meet the following requirements:
Hardware
DIA PCBAK105/1 version R2A or higher
RIA PCBAThe RIA PCBA is required if the K105/1 DIA PCBA has a version
lower than R3A.
CU PCBAK103/2 version R1A or higher
Software
CUSA102 02/1 version R3A or higher
Information for upgrades is located in the R2R, Repeater to Repeater Link Kit, Installation
Guide. (part # VD202 91/EN).
PSTNPSTN