User's Manual

Table Of Contents
AR Standard Repeater Commissioning
044-05250 Rev A 3-13
Commissioning
Before proceeding, carefully read the Safety section and check all connections made during
the installation. To fulfill the IP65 weather protective requirements, ensure cable strain relief
bushings are properly tightened. Also, ensure gaskets at cable inlets and on the cabinet are
properly fitted and not damaged.
A repeater can be configured locally with OM-Online by connecting a standard serial cable
from the COM port on the PC to the P31 PC port (RS-232) located to the right in the cabinet
as illustrated in Figure 3-15. The P31 PC port is described in Chapter 2. OM-Online is
described in the
OM-Online User Manual.
Figure 3-15 Connecting a PC for Local Access
For a BMU the PC is connected to the P106 port on the FON. The P106 port is described in
the FON section in Chapter 2.
Initial Startup
Table 3-7 Initial Statup Procedure
Step Action
1 Turn the main power on
2 Check the Yellow LED on the power supply unit. It must be a steady on
3 Check the four CU PCBA LEDs. Refer to the CU PCBA section in Chapter 2 for the cor-
rect power up indications
4 Check the three ALI PCBA LEDs or the corresponding LEDs on the RCI PCBA. Refer to
the ALI or RCI PCBA section in Chapter 2 for the correct power up indications. The LEDs
follow the alarm relays.
MS
DPX
ANT
TEST
DC
-30 dB
-20 dB
POWER SUPPLY UNIT
ALLGON INN OVATION
SWEDEN M105 R6
1
PARKING
FOR W5
W5
8
P27
W6B 10
1
P33
ALAR M
P23
LNA
UP-LINK
P32
MODEM
A
U
X
1
P28
DOOR
5
9
6
1
1
16
1
1
M
-
>
S
P11
P34
8
9
15
P26
15 16
S
-
>
M
1
2
3
89
P
3
6
5
X0A
X0B
2
V2
1
16
P12 P13
1
1
1
16
16
16P4
P5
P6
c
b
a
c
b
a
c
b
a
c
b
a
1P232
1
b
a
1
16P3
16
1
16
P14
1
V1
1
1
1
1
1
4
6
1
15
6
9
15
2
16
1
2
4
5
8
5
P35
P21
PSU
6
10
P31
PC
P29
P24
P25
GND
7
6V6
LNA
DOWN-LINK
LED
P22
1
2
P31