User's Manual
044-05210 Rev. A 2-1
Chapter 2
Installation
2.1 Introduction
This chapter contains unpacking, inspection and installation instructions for the EHP19 Integrated
Power Transceiver (IPT).
• Carefully read and understand all material in the chapter prior to installation.
• Review any government and local codes applicable to this installation.
• Before operating the equipment, read the operating instructions in Chapter 3.
2.2 Unpacking and Inspection
Perform the steps in Table 2-1 to unpack and inspect the IPT.
2.2.1 Damaged Equipment
If the equipment is damaged, a claim should be filed with the carrier when the extent of any damage
is assessed. Contact the factory for a return material authorization (RMA). Refer to Chapter 4.
2.3 Installation Instructions
Perform the following to install the IPT.
Table 2-1 IPT Unpacking and Inspection Instructions
Step Action
1 Carefully open the container and remove the IPT.
2 Visually inspect the IPT for damage that may have occurred during shipment. Check for
evidence of water damage, bent or warped chassis, loose screws or nuts, or extraneous
packing material in connectors. If possible, inspect the equipment in the presence of the
delivery person.
3 If possible, retain all packing material that can be reused for repackaging the components.
WARNING: Ensure the RF power has been removed from the RF input cable before
connecting the RF input cable.