User Manual
PowerOptimal Elon® 100 User Manual
Version date: 2022/06/28
Page 14 of 24
Version number: 2.15
© PowerOptimal (Pty) Ltd 2022. The content of this document is confidential and all rights to the intellectual
property and/or information contained herein remain vested in PowerOptimal, except if otherwise agreed in
writing.
4.3 Payback period
As can be seen from the graph above, payback period decreases as number of solar panels increases,
and is also different for Johannesburg, Cape Town and Durban
3
.
The reason that payback period improves (decreases) as number of solar panels increases, is because
there are some fixed costs (such as engineering design & safety components) and some costs that do
not scale linearly with array size (such as labour, wiring, mounting kit costs, etc.).
3
Calculations based on actual Elon performance, assuming a 20% reduction due to non-optimal user behaviour,
an initial electricity tariff of R2/kWh and an annual electricity price increase of 8%.