Product Manual
34
Operation
Follow the steps provided below for parallel operation.
Connect Parallel
Cables
1.
Connect the red parallel operation cable to the parallel operation
outlets designated with the red o-ring on each of the generators.
2.
Connect the black parallel operation cable to the remaining parallel
operation outlets on each of the generators.
Starting the
Generators
1. Start both generators and make sure that the output indicator (green)
on each generator comes ON.
Connecting
Appliances
1.
Plug an appliance into any of the AC receptacles.
2.
Turn on the appliance.
Note: If either generator is overloaded, or if there is a short circuit in a
connected appliance, the overload indicator (red) will go ON. The overload
indicator (red) will stay ON, and after about 4 seconds, current to the
connected appliance(s) will shut off, and the output indicator (green) will go
OFF. Stop both generators and investigate the problem. Determine if the
cause is a short circuit in a connected appliance or an overload. Correct
problem and restart the generator. Substantial overloading may damage or
shorten the service life of the generator.
Note: For single generator operation, the parallel operation cable must be
removed.
WARNING:
Never connect or remove the parallel operation cables when the generator is
running.










