Installation / Initial Set-Up
There are a number of important steps required to set up your generator for initial use. These
steps are:
Each of these steps is discussed in detail below:
1. Unpacking & Delivery Inspection
You should inspect the generator immediately after you receive delivery.
See the “Machine Component Identification” section of this manual for a
diagram of the generator and its components.
If you are missing or have damaged components, contact Product Support at 1-866-443-2576.
Funnel
Spark Plug Wrench
Part # 801009
and Handle Bar
Part # 801854
Parallel Cable Kit
Flat Head
Generator
(Sold separately)
Screw Driver
Part #89778
Part # 801855
2. Planning the Power Load
Plan your power load so that you do not exceed the generator’s rated capacity.
See the “Power Load Planning & Management” section of this manual to review how to plan and
manage power loads for the generator.
1.
2.
3.
4.
5.
Steps for Installation / Initial Set-Up
Unpacking & delivery inspection.
Planning the power load to stay within the generator’s rated
capacity.
Setting up generator for the type of power generation you need:
a.
portable power source, or
b.
connected to a building as a back-up power source.
Selecting a site for using the generator.
Grounding.