Product Manual A

Page 15 of 31
5. Place the funnel over the studs in the side of the Chipper Shredder and secure it with flat washer
(Ø8, 3pcs), spring washer8, 3pcs), and locknut (M8, 3pcs). See Pic.4.
Pic.4 Funnel installation
6. Install the battery assembly to the front part of the machine using the bolts (M8 x 20, 2pcs) and
locknut (M8, 2pcs). See Pic.4.2. Take off the battery cover and carefully connect the cables to
the batterys #2 terminal (+ in red and - in blue) firmly. NOTE: battery not included.
Pic.4.2 Battery Assembly Installation
7. Place the battery cover and attach it with bolts (M8x20, 2pcs), a flat washer (Ø8, 2pcs), and a
spring washer (Ø8, 2pcs). See Pic.4.3.
Battery Cover Installation (Pic. 4)