Case Study
All the cylinders were placed in a heated cure box, but it should be
noted that at some point in the evening of February 6th, it appears
that the cure box heater malfunctioned. Upon arrival at the jobsite,
it was observed that the cure box temperature was 50 ºF (10 ºC) as
displayed by the high-low thermometer inside the cure box. The
temperature of the cylinders reflects that drop in temperature.
The Ultimate Custom Heating Solution
Test Cylinder
Concrete Curing Case Study
9:38 14:02 19:32 01:02 06:32 12:02 17:32 23:35 05:41 11:47 18:53 01:01
TEMPERATURE
TIME
20
30
40
50
60
70
80
90
100
110
-7
-1
4
10
16
21
26
32
38
43
°F°C
Test Cylinder 72 Hrs
Total Time:
2.8 days
Max Temp:
75.5 °F 24.2 °C
Min Temp:
43.2 °F 6.2 °C