Case Study
This section used a standard construction insulating blanket
and no external heat was applied. The temperature attained is
consistently about 10 ºF (-12 ºC) lower than the adjacent section of
concrete covered by the unheated Powerblanket® . Note that the
temperature of the slab dropped noticeably over the last 8 hours
of curing time, likely due to the cold rain that fell at the jobsite.
Upon arrival at the jobsite at 6 a.m., it was observed that a portion
of the standard blanket had been blown o part of the slab near
where the sensor was located.
The Ultimate Custom Heating Solution
Section C: Standard Curing Blanket
Concrete Curing Case Study
10:24 14:45 20:11 02:15 07:35 13:02 18:53 00:36 06:42 12:48 18:53 01:01
TEMPERATURE
TIME
20
30
40
50
60
70
80
90
100
110
-7
-1
4
10
16
21
26
32
38
43
°F°C
Standard Blanket 72 Hrs
Total Time:
2.8 days
Max Temp:
82.3 °F 27.9 °C
Min Temp:
29.1 °F
-1.6 °C