Assembly Instruction
3. Assemble the Rock Post,
take the roof cross rail (I) and install it between
the Left Rack Post (G) and Right Rack Post (H)
using two Wood Dowels (6) and two M6 Long Bolt sets (2).
Two Barrel Nuts (4) have to be inserted into the back of
the Roof Cross Rail (I) before bolting..
Use #4 Allen key for tightening bolts.
Attach the Roof Board (J) to the assembled Rack post
using four Screws (5) by Phillip Head Screwdriver
(Not Included). See diagram below
4. Install the assembled Rack into the Surf Board Top (A)
using two M8 Bolt sets(1), each consisting of a M8 short bolt,
small lock washer and small flat washer (1, 8 and 7).
Use #5 Allen key(11) to screw the M8 bolts.
Wrap the Paper Raffia Apron (K) around the shack rim under.
the Surf Board Top (A) and Paper Raffia Canopy (L)
on the Roof Board (J).
Attach via Velcro strips on the Paper Raffia Apron (K) and
Paper Raffia Canopy (L) to the Shack.
Pressing firmly to secure.
See diagram below
Page 4 of 5
Assembler le pateau, prendre la barre croissé(I) et l’ istaller
entre le poteau gauche (G) et le poteau droite(H) en
utilisant deux goujons en bois(6) et deux M6 seriés des
longues verroux (2). Deux écrou tonneau (4) doivent être
Insérées dans la partie postérieure de lbarre toit croisée (I)
avant le boullonage. Utiliser la clé Allen #4 pour serrer les
verroux Attacher le Panneau toit (J) au poteau assemblé en
utilisant quatre Vis (5) par le tournevis Philip (pas inclus).
Regarder le diagramme ci-dessous
Installer le poteau assemblé dans le Panneau Supérieur
Surf (A) en utilisant deux seriés des verroux M8 (1) qui
consistent d’un court verrou M8, une petite rondelle et
une Petite platte rondelle (1,8 et 7). Utiliser le clé Allen
#5(11) pour visser les verroux M8 Envelopper le tablier
en papier Raffia (K) tout autour le bord de cabane au
dessous le panneau supérieur Surf (A) et le Daifs papier
en Raffia (L) au cabane. Presser pur l’assurer.
Regarder le diagramme ci-dessous