Instruction manual

Chapter 2. Getting Started
2.1. Requirements
2.1.1. Requirements for p3i_DIG
for the installation and use of the p3i_DIG frame grabber you need:
the frame grabber board.
digital Camera with RS422 or LVDS signaling standard
Camera Cable
PC with free PCI slot and Pentium CPU.
Windows XP, Vista, Windows 7 or a Linux operating system.
Operating system dependent hardware driver setup and system independent development files
2.1.2. Requirements for p3i_CL and p3i_CL/PMC
for the installation and use of the p3i_CL and p3i_CL/PMC frame grabber you need:
the frame grabber board.
CameraLink camera
CameraLink cable
Computer system with free PCI/PMC slot and Pentium CPU.
Windows XP, Vista, Windows 7 or a Linux operating system.
Operating system dependent hardware driver setup and system independent development files.
2.2. Hardware installation
Switch off computer
Prepare site to observe electrostatic discharge (ESD) precautions before opening computer or
removing appropriate P3I3 family member from its case: Touch computer steel case during
insertion/removal of the frame grabber or take other precautions to ensure the absence of high
voltages due to electric charges.
Open computer case, remove blind back panel
Insert the board into a free PCI/PMC slot; the board must fit into the slot without use of excessive
force, make sure it sits firmly in the slot and the PCI connector conductors sit completely inside the
connector.
Fix the back panel with a screw.
Close case.
2