User's Manual
14
EN
GETTING STARTED
GETTING STARTED
Remove all protective packaging materials
Remove all protective packaging materials
Remove all protective foam and labels from
the robot.
Place the docking station
Place the docking station
Docking station location
Docking station location
Remove the cover on the back of the docking
station to plug in the AC adapter to the docking
station and a wall outlet.
For best performance, place the docking
station against a wall leaving at least 2.3 ft
(70cm) on each side and at least 5ft (150cm)
in front.
1
.5m(5
’)
0.7m
(2.3’)
0.7m
(2.3’)










