Installation Guide
7
ASSEMBLY INSTRUCTIONS
6.
Determine the hanging length for fixture (H).
Use pliers, a flathead screwdriver and a soft cloth
(all not included) to open the link of chain (B) at
length chosen. Remove any extra chain (B) at this
time.
Feed wiring from fixture (H) up through chain (B)
to pre-determined length.
46
Soft Cloth
Pliers
Screwdriver
Wiring
B
7.
Feed chain (B) and wiring through threaded
ring (E) and then canopy (A), allowing
threaded ring (E) and canopy (A) to slide
down the chain (B) until they reach the top
of fixture (H).
Lift chain (B) toward screw collar loop (F)
and hang chain (B) on connecting chain link
(CC). Close connecting chain link (CC).
Feed wiring up through hole at bottom of
threaded rod (D). Gently push wiring until it
comes through top of threaded rod (D). Pull
all wiring until there is no extra slack left in the
wires running through the chain (B).
8.
Wiring
8
Prepare wire by stripping 3/4 in. of insulation
from wire ends using wire strippers (not
included).
D
B
A
CC
F
B
7
E
H