User manual
- EN -
11
Commissioning/start-up
How to proceed:
The rechargeable battery of the unit is not charged. Expose the unit to sunlight for one day before using it for the first
time. Then use the remote control to operate the device.
Solar module: Connections and labelling
Battery status:
Charger Pump Light
Green: fully charged
Orange: half charged
Red: needs charge
Remote Control
Timer
LED
Hi
On/Off
A
B
C
D
1
23
PSO0045
Description Function
1 LED display for the rechargeable battery capacity LED is lit green: The battery is charged.
Possible pump operating time: 4 to 6 hours
LED is lit orange: The battery is half discharged.
Possible pump operating time: 2 to 3 hours
LED is lit red: The battery is nearly empty and needs to be charged.
Possible pump operating time: less than 1 hour
LED off: The battery is discharged beyond the limit.
The pump and LED lighting are switched off.
2 LED lighting connection socket —
3 Pump connection socket —
Remote control
D
The remote control has a range of max. 10 m.
Description Function
A
Determines the pump operating time (max. 4 h).
To overwrite the current setting, switch off the pump with
key D and then set the new pump operating time with key
A. The pump will then start up automatically.
Press the key slowly 1 . The LED flashes according to the
newly set pump operating time.
Example: Desired pump operating time 3 h.
Press the key A 3 slowly. The LED flashes 3 several
times in a row.
B
Switches the LEDs on and off (they are only lit when it is
dark)
Press the key briefly.
C
For setting the flow rate of the pump (5 stages)
Press the key slowly 1 for each stage.
D
For switching the pump on and off Press the key briefly.