Phau Ntawv Qhia

PH04 Comfort XLT Flushing - June 2019
Page 11 of 15
Step 6a. Foot Flush Waste Tank Installation
Place the waste tank into position and insert the two hoses coming from the foot pump into the two holes in
the back rib of the tank. Locate the discharge hose (the hose coming from the right side hole) and place a PC-
000352 clamp on the end. Connect the hose to the nozzle mounted on the back of the ush bowl and tighten
the clamp in place. For Recirculating Flush: Locate the intake hose (coming from the left side hole) and place
a PC-000352 clamp on the end. Insert the plastic lter assembly into the end of the hose and tighten the
clamp in place. For Fresh Flush: Take the intake hose (coming from the left side hole) and push it through the
hole on the right side of the tank, leaving no slack inside the tank.
Step 6b. Waste Tank Installation (all ushing styles)
On the outside of the unit measure and
mark drill spots. All holes will be 17-3/4” up
from the top of the base surround. For the
rear wall panel make a mark above each
corner’ in the bottom rib. Make another
mark half way between those two. For the
corner molding, make a mark on each side of
the center rib, centered in the at area. On the
left wall panel, make a mark above the ‘corner’ of
the bottom rib and another 13-1/2” towards the front.
Position the waste tank in the left rear corner on the tank
supports of the base surround. While inside one person
holds the tank in the proper position, using a 13/64” bit,
someone on the outside will drill through the 7 spots
just marked. CAUTION: WHEN DRILLING HOLES, ES-
PECIALLY THE REAR PANEL, BE SURE TO DRILL ONLY
THROUGH THE FIRST WALL OF THE TANK. Place
a PC-000106 back-up washer on the body of the
PC-000105 rivet and rivet in place. Repeat this
for the remaining 6 holes.
PC-000106 Washer
7 Used in this step
17-3/4”
11-1/2”
2-1/2”
13-1/2”
2-1/2”
PC-000105 Rivet
7 Used in this step
Each of the three sidewall panels has two vent
screens. On the surface of each screen there is
a date stamp symbol. The symbol goes toward
the center of the sidewall panel, facing the inside.
For each of the sidewalls, insert into the vent
slot one screen from each side and overlap the
center holes of the screens (at the date stamp
symbol). IMPORTANT - MAKE SURE BOTH
SCREENS ARE CENTERED IN THE VENT SLOT.
From inside the unit using a 13/64” drill bit, drill
a hole through the center hole of the screen and
into each of the side walls. From the outside riv-
et a PC-000100 rivet into the center hole with a
PC-000106 back-up washer on the inside. From
inside the unit using the holes at the ends of
the screens as guides, drill holes through to the
wall panels. From the outside rivet the screens
in place with PC-000100 rivets and PC-000106
back-up washers on the inside.
Step 7. Fly Screen Installation
PC-000100 Rivet
9 Used in this step
PC-000106 Washer
9 Used in this step