User's Manual
  Polycom
®
 CMA
®
 System Conference Scheduling Overview
Polycom, Inc.  47
Some notes about bridge reassignment:
• The bridge reassignment process only occurs when the system detects that 
a bridge is down. It does not occur if the system determines that a bridge 
does not have sufficient resources required to host the conference.
• If the CMA system cannot find another bridge with the features and 
capacity needed to support a conference, the conference fails to start. The 
system does not attempt to modify the conference settings in any way. 
Instead, the system sends an email to notify the conference organizer of 
the failure.
• The system will chain bridge reassignments. This means that if the next 
bridge to which the system assigns a conference is down at the time the 
system tries to start the conference, the system will try to reassign the 
conference again.
• If the bridge to which the system reassigns a conference has ad hoc 
conferences on it, the CMA system is unaware of those conferences. The 
reassigned conference may fail to start if ad hoc conferences are 
consuming resources the CMA system expected to schedule. This is 
known behavior and is avoided by applying the best practice of not using 
bridges for both scheduled and ad hoc conferences.










